Dry verge caps installation cp tile protection.
Fitting dry verge roof edge finishing.
Install the underlay if required and ensure all battens extend beyond the gable wall or bargeboard by 20 40mm.
The roof tiles are fitted in the usual manner ensuring that the verge tiles are fully inserted into the continuous dry verge where the top flange will hold them securely in place.
Dry verge caps are usually made of plastic which in itself offers some distinct advantages.
Take a dry verge piece and align the edges on the underside of it with the edges on top of the starter verge.
Fix the batten end clips to the end of each batten.
Fitting of continuous dry verge slate profile the roof battens are fixed in place to the required slate gauge however the batten ends are not fixed in place as yet to allow the 60mm flange of the slate verge to be fitted under the batten which is the easiest way to fit in place.
Fit the verge piece onto the starter verge so flush against it and there isn t any space between the 2 pieces.
Save money on marley eternit roofing products at roofinglines http bit ly 2cj9rqb.
The roofing felt and battens should be laid across the cavity and the battens finished flush with the outer wall or the outer edge of the bargeboard.
Made from pvc u our dry verge roof finishing uses a simple clip fixing system of end caps for easy installation.
The most obvious advantage is plastic s durability.
Dry verge roofing makes use of interlocking caps that fit over the edge of your roof tiles and offers an effective and more importantly durable alternative to wet verges.
Take a length of verge extrusion and plumb cut the upper end.
How to fit a dry verge step 1.
This will create a secure place on which you can fix the.
Completely weather proof it requires no maintenance and is available in various attractive colours to complement your roof line and roof tiles.
At the eaves the verge should be cut square flush to the lower tile.
Fit the eaves closure.
Finish the ridge with either a ridge end cap or a block end ridge.
The water channel allows any rainwater to run directly into the rainwater gutter.
A timber batten can then be installed running from the eave to the ridge to provide a base for the units to fix.
Position a verge piece against the top of the starter verge.
Fitting dry verge to old roof.
Plastic verge caps should last you at least 10 years and require a fraction if any of the maintenance associated with mortar.